A HIGH PROFILE FLOOR SYSTEM
The Charger Oaks High School in California wanted to upgrade their old, gym floor and required a high profile floor system with leveling flexibility to accommodate an uneven subfloor.
Junckers 2-layer batten system DuoBat 120+ worked perfectly for this purpose. The system can be installed with a profile span of 120 – 242mm and levelling is easily done by using Junckers adjustable and locking wedge system, totally without use of nails and tools.
1000 m² of Junckers solid hardwood SylvaSport Beech Premium were installed in this gym.
Kategorier
Kvadratmeter
1000 m2
Contractor
Champion Hardwood
Land
USA
Plats
Covina, California